Welcome to WattAnalysis
Research and verified data on China's energy system — what we publish, how we work, and where to start.
This is the first issue of the WattAnalysis newsletter.
WattAnalysis publishes research and verified data on China's energy system and the global supply chains it is reshaping — written for the people who have to make decisions about those supply chains: procurement, compliance, strategy.
How we work
Primary sources only. Every figure we publish traces to an official release — a ministry document, a statistics bureau table, a standards text, an exchange filing. If a number cannot be traced, it does not appear. Where official sources conflict, we publish both numbers side by side and say so; we do not quietly pick the convenient one. What we cannot verify, we label as unverified or leave out, and our data pages keep a public list of what we checked and withheld.
What you get
- The Weekly — every Monday: what changed in China's energy system that week, what it means, and what to watch next.
- Deep dives — one question at a time, taken back to the primary sources: a capacity figure everyone cites, a standards rule suppliers keep getting wrong, a plan document read line by line.
- The data library — on wattanalysis.com: 39 monthly indicator series, verified records for thirty listed energy companies, product rankings, and a tariffs & market-access tracker that follows the cliff dates.
In December we publish the first issue of our China new-type storage outlook — a forecast whose numbers are registered in advance and scored in public.
Start here
The archive opens with nine pieces:
- China's 15th Five-Year storage plan keeps 300 GW — the changes are duration and payment eligibility. Beijing's implementation plan for new-type storage, read line by line. https://newsletter.wattanalysis.com/chinas-15th-five-year-new-type-energy-storage-implementation-plan-keeps-300-gw-the-changes-are-duration-and-payment-eligibility/
- The 136 GW Question. A headline figure everyone cites, taken back to the releases it came from. https://newsletter.wattanalysis.com/the-136-gw-question/
- GB, GB/T, and the Fine Print. China's standards hierarchy decides what is mandatory and what is merely recommended — and suppliers get this wrong in both directions. https://newsletter.wattanalysis.com/gb-gb-t-and-the-fine-print/
- China's AI Power Crunch, in Primary Sources. Data-centre power demand is the most-quoted, least-sourced number in China energy. Here is what the primary sources actually print — and what they don't. https://newsletter.wattanalysis.com/chinas-ai-power-crunch-in-primary-sources/
- The 314Ah Standard. How a single cell format quietly became the storage industry's standard size. https://newsletter.wattanalysis.com/the-314ah-standard/
- Solar's Glut, Verified. The overcapacity story, checked figure by figure against official releases. https://newsletter.wattanalysis.com/solars-glut-verified/
- The Hydrogen Number Beijing Hasn't Published. The most-cited hydrogen figures in China are ones no official source has ever printed. https://newsletter.wattanalysis.com/the-hydrogen-number-beijing-hasnt-published/
- Decoding Beijing. A field guide to reading China's energy documents: what the wording commits to, and what it leaves open. https://newsletter.wattanalysis.com/decoding-beijing/
- WattAnalysis Weekly, 9–15 November 2026. The weekly briefing format: what changed, what it means, what to watch. https://newsletter.wattanalysis.com/wattanalysis-weekly-9-15-november-2026/
The next Weekly lands on Monday 23 November.
One ask
Subscribing is free. If you know someone who works on China energy supply chains — procurement, compliance, strategy — forward this to them.
— Watt, WattAnalysis
Questions and corrections: [email protected]